INDIANAPOLIS — The Indiana Department of Transportation (INDOT) announced that the new Monon Loop is set to open in mid-May. This permanent section of trail will serve as a detour during construction of the North Split to ensure public access to the Monon Trail throughout construction.
Construction began on the Monon Loop late last year. This new connection to the Monon Trail will serve as the pedestrian detour route while a portion of the Monon Trail is closed during reconstruction of the North Split interchange. The current Monon Trail runs beneath several interstate bridges within the interchange. The new Monon Loop will remain after the North Split project is complete in November 2022.
The Monon Loop will be constructed within existing right-of-way and will follow the Old Northside Trail. New trail construction will continue west/southwest to College Avenue. The existing sidewalk along College Avenue will be reconstructed to a 12-foot multi-use path along the east side of the roadway. The Monon Loop will also connect to the Cultural Trail at 10th Street.
Access to all parks in the project area will be maintained at all times during construction. The Frank and Judy O’Bannon Old Northside Soccer park and a portion of the Old Northside Trail will be reconstructed and widened within the Frank and Judy O’Bannon Old Northside Soccer Park.
Detailed maps with construction-related closure and access information can be found on the North Split Web site: northsplit.com/maps/.
-
Other News This Week
- Greenfield: The Great Flood of 1913, Part 1
- 2026 Indiana Agriculture Photo Contest Winners Announced
- Singing Again
- FACE to Hold Last Low-Cost Animal Clinic for 2026
- Art Squared Returns to Fountain Square in September
- This Week’s Issue: Aug. 21-27
- FSSA Will Provide Tools to Determine HIP Work Requirements
- Shakespeare, Thunder, and Girl Scout Cookies – IndyFringe Favorites
- Mayor Proposes $1.89 Budget for 2027
- Applause!: Aug. 21-27
Search Site for Articles


