INDIANAPOLIS — Citizens Energy Group’s work to improve the wastewater system will result in the temporary closure of Pleasant Run South Drive from East Pleasant Run Parkway N. Drive through the intersection at N. Ritter Ave. beginning Aug. 2. Traffic will be detoured using 10th St., E. Washington St., and N. Arlington. Most of Ellenberger Park will remain open. Construction is expected until the end of September.
Site preparation will begin for the Pleasant RunTunnel segment of the DigIndy Tunnel System that begins in the southeast corner of Ellenberger Park. This will not affect traffic. However, the project will close the southeast quadrant of the park — the athletic fields — until work is completed in 2025.
-
Other News This Week
- Fresh Air Camps
- Greenfield: The Great Flood of 1913, Part 1
- FACE to Hold Last Low-Cost Animal Clinic for 2026
- Singing Again
- Art Squared Returns to Fountain Square in September
- Mayor Proposes $1.89 Budget for 2027
- FSSA Will Provide Tools to Determine HIP Work Requirements
- Shakespeare, Thunder, and Girl Scout Cookies – IndyFringe Favorites
- Applause!: Aug. 21-27
- Library Sets New Summer Reading Record
Search Site for Articles


